Wednesday, June 9, 2010

>WEEK 10< DAY 47 - 8 June 2010 (Tuesday)

Continue work...

-Remove the connecting rod bearing cap
-Remove the lube oil pipe on the right side
-Lift out piston and connecting rod
-Relocate all connecting rod and piston to the GF4 station workshop
-Arrange manpower from Lemal to take cylinder head, fuel pump and fuel injector back to Lemal
-Cleaning outer part of the engine
-Remove inlet and outlet cap of the tube oil cooler
-Take back cylinder head, fuel pump and fuel injector to Lemal

No comments:

Post a Comment